All articles

News lesson22 May 2026

When the Pictures Are Easier Than the Building

The Line promised mirrored walls, rapid transport and homes within easy reach. Semafor reported in May 2026 that further work would wait until after 2030.

A vast desert building site where concrete foundations, cranes and lorries stretch in a dead straight line to the horizon, with a man in white robes and a hard hat reading a tablet.

Before you read

1Warm up3 questions

Talk about these questions with a partner.

  1. Would you live in a city with no private cars?
  2. What would you want within ten minutes of your front door?
  3. Would a completely planned city make everyday life simpler?
2Key words8 words

These words are in the article. Choose the letter of the meaning for each one.

  1. radically
  2. stacked
  3. promotional
  4. infrastructure
  5. investment
  6. innovation
  7. realistically
  8. slips
  • Aa new idea or way of doing something
  • Bbasic systems such as roads, power and water
  • Cmade to advertise something
  • Dput one on top of another in a pile
  • Emoney put into something to make a profit later
  • Fmoves later than planned
  • Gin a way that is sensible about what can really happen
  • Hin a very large and complete way

Read

3Read the article

The paragraphs are numbered. Look out for the key words from task 2.

Intermediate version

Saudi Arabia once presented The Line as a radically different answer to urban life. Instead of spreading outwards like an ordinary city, it would stretch for 170 kilometres through the desert, with homes and services stacked into a narrow, high-density structure. Promotional images showed two enormous mirrored walls cutting across the landscape, and they travelled around the world within days.

The Line forms part of NEOM, a development project intended to attract international investment and support Saudi Arabia's effort to diversify its economy away from oil. Its promoters imagined neighbourhoods linked by rapid transport, with daily necessities within easy reach and far less dependence on private cars. On paper, it solved problems that older cities have struggled with for a century.

The promise was extraordinary, but so were the practical obstacles. A city on this scale would call for vast amounts of construction material, energy and water, as well as complicated transport and infrastructure systems. Creating comfortable public spaces inside such an unusual structure presents challenges that cannot be solved by dramatic computer images alone, and the desert environment makes every one of them harder. There is no existing city of this shape to learn from either, so even routine engineering decisions have to be worked out from scratch.

In May 2026, Semafor reported that further work on The Line had been put back until after 2030 as Saudi authorities reconsidered their spending priorities. The report did not establish that every element of the plan had been permanently abandoned. It did, however, point to a widening gap between the early promotional vision and what might realistically get off the ground in the near future. Governments rarely announce a change of heart loudly, which is why a reported delay can say more than an official statement.

Large projects often change as costs rise and governments face competing demands on their budgets. Supporters argue that ambitious experiments can drive innovation even when their original scale is scaled back, and that a few useful ideas may survive. Critics question whether the money would be better invested in housing, public transport and infrastructure that communities can actually use within a decade. There is also a question of timing, because a project that slips by ten years loses the technology and much of the enthusiasm it was designed around.

The Line is a particularly dramatic example of a familiar dilemma. An impressive design can persuade people that the future is already visible and more or less paid for. Construction forces them to confront far less glamorous questions: how much will it cost, who will live there, and what happens if the financial plan no longer adds up?

After you read

4True, false or not given5 statements

Choose T (true), F (false) or NG (the article does not say).

  1. The Line's promoters expected most residents to depend on private cars.
  2. The report established that the plan had been permanently abandoned.
  3. The delay was linked to a change in the Saudi authorities' spending priorities.
  4. Investors have asked for their money back.
  5. The writer suggests that a very long delay can weaken the idea behind a project.
5Vocabulary6 gaps

Complete the sentences with words from the box. Two words are not needed.

dilemmadiversifyexpansionglamorousnecessitiesobstaclesreconsideredreluctant

  1. The team overcame several before the bridge was finally opened.
  2. After the flood, the charity gave families food, water and other basic .
  3. After the protest, the council its decision and agreed to keep the library open.
  4. Countries that rely on one product often try to their economies.
  5. Choosing between a high salary and more free time is a real for many people.
  6. The magazine's covers look , but daily life for the staff was far from exciting.
6Verb forms5 gaps

Write the correct form of the verb in brackets.

  1. By the time the report was published, the early images around the world. (TRAVEL)
  2. Details of the new budget yet. (NOT / PUBLISH)
  3. Critics say the money on housing instead. (SHOULD / SPEND)
  4. While the engineers the materials, the budget was cut. (TEST)
  5. When costs rose sharply, officials to wait. (DECIDE)
7Language focuslinking words

Complete the sentences with words from the box. Two words are not needed. Despite takes a noun phrase. Whereas introduces a contrast clause. Otherwise, therefore and unless each begin a new clause or sentence.

despiteotherwiseprovidedthereforeunlessunlikewhereas

  1. the enormous costs, the government kept the project going for years.
  2. Some people see the project as a bold risk, others see it as a waste of money.
  3. Costs must be controlled; , the budget will run out.
  4. The first phase took longer than planned. , the opening date was moved back.
  5. The project will not go ahead the government finds extra funding.

Speak

8Talk about it3 questions

Discuss in pairs or small groups. Give reasons for your answers.

  1. What would you ask the people behind a huge new city before moving there?
  2. Can a city designed on paper leave room for unexpected ways of living?
  3. Would you rather improve an existing city or build a new one?
9Role-play: shrink the city or keep the dream

Work in pairs. Read your card, then have the conversation. Swap roles and do it again.

Student A · the government adviser

You want to keep the full 170-kilometre plan. Explain why the idea is important. Answer your partner's worries and try to agree a plan.

Student B · the finance officer

You think the city is too costly. You want to make it smaller or wait until after 2030. Ask about the cost and offer a compromise.

Useful phrases

  • I'm worried about the cost.
  • We can't give up on this dream now.
  • What would that mean for the people who live there?
  • Could we start with a smaller version?
  • I'd rather wait than waste the money.
  • Let's agree on a plan we can both support.

Afterwards, tell the class: did you keep the big plan, shrink it or put it off, and why?

Your words

Highlights0 saved

Was this lesson useful? Support johnplusnews on Ko-fi

Source: Semafor

About this article

Written with AI assistance and edited by John. The illustration is generated for this site; it is not a photograph of the events reported. Spotted a mistake? Tell us.

Written with AI assistance and edited by John. The illustration is AI-generated.

Continue reading